defects.sg

How grades work

The whole method, published. Every firm is measured on the same three things.

These grades are not yet in force. No firm on defects.sg has a published grade, because none has finished enough projects. The method below is what will produce them, and the exact cut-off between one letter and the next is still provisional. See the last section.

An example grade, ABA, and what each of its three letters means.
  1. First letter A

    Typical project

    The middle of its last 10 projects.

    Shown from 3 projects.

  2. Second letter B

    Average

    All of its last 10 projects, averaged.

    Shown from 3 projects.

  3. Third letter A

    Most common

    The letter it gets most often.

    Shown from 5 projects. A tie shows a dash.

The colour follows the first letter.

  • Excellent every time.
  • A typical firm.
  • Below a typical firm.
  • Most of the list left unfixed.
  • 3 or 4 projects: no most common yet.
  • Fewer than 3 projects: no grade yet.

What we measure, and what we don't

We do not judge whether a defect was fixed to a reasonable standard, and we do not decide how many defects a job of a given size ought to produce. Both are guesses, and the second one is worse than a guess: a client who inspects every week logs many more defects than one who visits twice, on identical work.

The number of defects raised says as much about the client as the firm.

So we measure three things that are entirely about the firm: what it did with the list it was given.

1. How much of the list got resolved

The share of a client's defects the firm actually resolved by the end of the project, weighted so that serious defects count for more than cosmetic ones.

A defect's weight is set by the kind of work it is:

  • Painting / touch-up ×0.5
  • Tiling ×1
  • Glass & aluminium ×1
  • Plumbing ×1.2
  • Electrical ×1.2
  • Wet works ×1.2
  • Hacking / masonry ×1
  • Carpentry ×1.5
  • Waterproofing & structural ×2
  • Other ×1

A firm that fixes every paint mark and leaves a leak has resolved most of the items and very little of the weight, and its figure reflects that.

A defect settled by agreement with the client counts as resolved. There is no limit on how many can be settled and no penalty for settling.

2. How long it took

Anything put right within 4 days is prompt and scores full marks. From there the score falls away, reaching zero at 30 days. A defect never resolved counts as the full 30.

Not every defect needs doing straight away, and a client and firm often agree that something can wait until later in the works. So each defect carries a “needs attention now” switch, on by default, which only the client can change.

  • On. The defect is measured against 30 days.
  • Off. It is measured against the length of the job instead.

Switching it off does not remove a defect from the measurement. It gives it a longer clock, which is what was actually agreed. A deferred defect still sitting unresolved at the end uses its whole allowance, exactly like any other.

Every time the switch is flipped, it is logged with who and when, and the firm sees it. Once grades are published, the share of a firm's defects that were marked as needing attention will appear alongside the rest of its record.

3. Whether the fix held first time

Of every repair the firm claimed to have made, the share the client accepted on the first attempt. A fix that was claimed, rejected, and then abandoned counts here as a failure.

Because it is measured against what the firm attempted, we always publish it with that wording (“of attempted fixes held first time”) so it is never mistaken for a statement about the whole list.

The project score

The three combine, weighted:

  • 55%

    for how much of the list got resolved

  • 30%

    for how long it took

  • 15%

    for whether the fix held first time

The result runs from 0 to 1, and higher is better. A project where everything was resolved within 4 days and every fix held scores exactly 1.000.

Defects raised in the last 14 days before sign-off are left out of all three measurements. A firm cannot be marked down for a defect it was given no real chance to see.

The grade: three letters from the last 10 projects

Each finished project gets a letter from A to E. A firm's grade is three of those letters, read left to right:

  1. Typical project. The middle one of the last 10. With an even number, the lower of the two middle ones.
  2. Average. Every project counted, the bad ones too. This is the letter one bad job pulls down.
  3. Most common. The letter most of those projects got.

A firm that is excellent every time is AAA. A firm that is usually excellent with one or two bad jobs reads ABA: its typical project is still an A, and the average says what happened.

  • Fewer than 3 finished projects: no grade yet (- - -). That is an empty record, not a bad grade, and it stops one unusual job from deciding a letter.
  • 3 or 4 projects: the first two letters, and a dash for the third (for example AB-).
  • 5 or more: all three. If two letters are tied for most common, the third stays a dash.
  • A
    0.85 and aboveAlmost everything resolved, quickly, and the fixes held
  • B
    0.75 and aboveAbout what most firms manage
  • C
    0.62 and aboveNoticeably below most firms
  • D
    0.45 and aboveWell below
  • E
    below 0.45Most defects left unresolved, or left for a long time

The three numbers we chose, and what will replace them

Everything above is measured except three numbers, which we picked:

  • 4 days counts as prompt, to become the speed of the quickest quarter of firms on the platform.
  • 30 days scores nothing on speed, to become the speed of the slowest tenth.
  • 14 days before sign-off is too late to count, to be reviewed once enough projects have finished.

The cut-offs between letters are provisional. They are reasoned rather than fitted, because no firm has finished enough projects to fit them against. They will be set from the real spread of firms before any grade is published, and we will say on this page when that happened and how many projects it was based on.

The rule that will not change: a typical firm gets a B.

Who can add a defect

Three people can add a defect to a project: the client, the defect checker the client appointed, and the firm itself. Only the client can send the list, accept a fix, settle a defect or sign off. A firm can take back a defect it raised itself, and the client is emailed and notified the moment it does. Nobody can delete a client's defect but the client.

A defect a firm raises about its own work is scored against the firm, never for it. Left unresolved it counts against the firm exactly like one the client found. Resolved, it is taken out of both halves of the published figures, so self-reporting cannot lift a firm's numbers. It still gets the item written down and fixed.

We show the split on every firm page: how many defects clients raised, and how many the firm raised about itself. A defect your appointed checker raises counts as one you raised, because they are checking on your behalf. Who raised a defect is recorded once, when it is added, and nobody can change it afterwards, including the firm and us.

If a firm disagrees with its grade

The grade is computed from the record and nothing else. We never adjust a grade by hand and there is no number anyone here can reach in and change. If something in the record is wrong, correcting the record recomputes the grade on the next nightly run.

What we never do

The grade is not for sale at any price. No firm or renovator can buy a position, a badge or a place in search. There is no browsable list of firms, no star rating, and no letter anyone here can reach in and change. Firms can never edit or delete a client's defect.

One thing on this site is paid for, and it is not in the registry: a defect checker can buy a labelled seat at the top of the checker list. Checkers carry no grade, so there is nothing there to rank and nothing to buy up.